CK-104 LONG LEAD with NSN 5910-00-113-5499 by Crl Components Inc - Request an Instant Quote
-
Part Number: CK-104 LONG LEAD
-
Alternate P/N : CK104LONGLEAD
-
Manufacturer: Crl Components Inc
-
NSN: 5910-00-113-5499 (5910001135499)
-
NIIN: 001135499
-
Item Name : Capacitor Fixed Cer
-
CAGE Code: 71590
-
FSC: 5910 Capacitors
Your required NSN Part CK-104 LONG LEAD Under Capacitor Fixed Cer with FSC 5910 Capacitors manufactured by Crl Components Inc having CAGE Code 71590 is now in stock and available for immediate dispatch! The NSN for this particular part is 5910001135499. If you are interested in obtaining the best quote for NSN Part CK-104 LONG LEAD, you can easily do so by filling out the form.
To get started on the purchasing process for part CK-104 LONG LEAD we request you fill out all the necessary fields, particularly those marked with an asterisk (*) so our team can give you a complete quotation based on the detail you submit. So why wait? Request a quote today for a part number CK-104 LONG LEAD and get started on your project right away!
Upload RFQ Sheet
If you have more than one item, upload your spreadsheet here
NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | A | A | 0 | |||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| Ck-104 Long Lead | B | 1 | C | A |
Characteristics Data of NSN 5910-00-113-5499, 5910001135499
| MRC | Criteria | Characteristic |
|---|---|---|
| AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
| AARG | RELIABILITY INDICATOR | ESTABLISHED |
| AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
| ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
| ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
| ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
| ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
| AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
| AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
| AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
| CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
| CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
| CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
| CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
| CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
| CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
| CWJK | CASE MATERIAL | PLASTIC |
| CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
| CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
| CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
| NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
| TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
| TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
| ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Top NSN Manufacturers
Cogent Sourcing is an ASAP Semiconductor owned and operated a website and one of the leading distributors of hard-to-find and obsolete electronic parts in the USA. Our vast inventory consists of over 10 million unique National Stock Numbers (NSN), all ready to ship immediately. We ship parts from our headquarters in California and our warehouses in Illinois, Nevada, Pennsylvania, Oregon, Minnesota, Arizona, New York, Virginia, Washington, Massachusetts, Michigan, Wisconsin and New Mexico. We also have our sales office at Alberta in Canada making sure that no matter what, we can offer you the best lead times and fastest delivery possible.
Featured Parts
Low PriceWarrantied inventory at competitive prices |
|
Find it fastSearch the world's largest inventory of electronic components by manufacturer, category or part number |
|
Get it fastAll inventory ready to ship from our sellers |
|
Quality guaranteedWe sell only warrantied and traceable parts |